Move the Order Queue into the Kitchen Work Zone
The buying decision for a Windows system ordering terminal should start with the service bottleneck, not the diagonal screen size. In kitchen order sequencing and preparation status, the embedded Windows platform can consolidate information that would otherwise be split between paper tickets, verbal updates and a remote office PC.
Kitchen staff can view incoming tickets, preparation timers and exception notes on a fixed station placed near the relevant production zone. The 5:4 display format gives vertical order queues more room than a wide entertainment-style screen, supporting quick scanning during busy periods.
The operational goal can then be translated into measurable acceptance points: which information must remain visible, how quickly an exception is recognized and what the operator does when a connected service is unavailable. These questions keep the application and enclosure focused on the real service moment instead of adding features that slow the team down.
Why a 5:4 Screen Helps Busy Preparation Lists
| Specifications of Embedded Windows All-in-One Computer with 17-Inch Display | ||||
| LCD Panel Parameters | Screen Size | 17 Inch | ||
| Display Area | 337.92 mm.(Height) X 270.34(Width)mm. | |||
| Aspect Ratio | 16 : 9 | |||
| LCD Type | a-Si TFT-LCD Monitor | |||
| Maximum Resolution | 1280 X 1024 | |||
| Display Color | 16.7M , 72% NTSC | |||
| Brightness | 250cd/m² | |||
| Contrast Ratio | 1200 : 1 | |||
| Viewing Angle (Up/Down/Left/Right) | 89°/89°/89°/89° (Type)(CR≥10) | |||
| Response Time | 20ms | |||
| LCD Panel Lifespan (Hours) | 60,000(Hour.) | |||
| Field Frequency | 60Hertz | |||
| Audio parameters | Audio system | Stereo | ||
| Speaker size | ≈ 99 x 45 x 20 mm | |||
| Impedance | 8 Ohm | |||
| Power | 2 x 5 Watt | |||
| Loudness | > 80 Decibel | |||
| Interface | 4-pin connector | |||
| Internal computer configuration (Choose one of two) |
CPU | Intel i5-4310M Generation 4, Dual-Core Four Threads, Main frequency can reach up to 2.7GHz | Intel I5-6100T Generation 6, Dual-Core Four Threads, Main frequency can reach up to 3.2GHz | |
| Graphics Card | Integrated Graphics Card Intel® HD 4600 | Integrated Graphics Card Intel® HD 530 | ||
| RAM | 4GB | 8GB | ||
| Storage Memory Capacity | 128GB | 256GB | ||
| OS | Win10 or win11 Optional | Win10 or win11 Optional | ||
| Wi-Fi Built-in | Speed 150Mbps 802.11n wifi Integrated | Speed 150Mbps 802.11n wifi Integrated | ||
| Media Format | Video Format | wmv, avi, flv, rm, rmvb, mpeg, ts, mp4 etc. | ||
| Audio Format | MP3, WMA | |||
| Photo Format | BMP, JPEG, PNG, GIF etc. | |||
| Onboard Interface | Network port | RJ45 X 1, 10M/100M Adjustable Ethernet | ||
| HDMI | 1 | |||
| USB | 4 | |||
| Power | Power Supply | Alternating Current 100V~240V, 50/60Hz | ||
| Maximum Power Loss | ≤ 30 Watt | |||
| Standby Mode Power Loss | < 1 Watt | |||
| Features | Operating Temperature | 0℃ ~ 50℃ | ||
| Storage Temperature | Below 10℃ ~ +60℃ | |||
| Package Size | Device Dimensions | 400.6 X 338.6 X 50 mm. | ||
| Net Weight | 5.5 Kilogram | |||
| Package Size | 48 X 39 X 15 Centimeter | |||
| Gross Package Weight per Unit | 6 Kilogram | |||
Order Management Software
The 17-inch LCD is specified at 1280 × 1024 resolution, 250 cd/m² brightness and 1200:1 contrast. The embedded computer can use one of the listed Intel processor options with 4 GB or 8 GB RAM and 128 GB or 256 GB storage. Windows 10 or Windows 11 is listed as optional. RJ45, HDMI and four USB connections support system integration, while maximum power consumption is listed at 30 W. The selected combination must be recorded with the approved sample.
The final Windows image should match the ordering application, language set, network policy and restart procedure. Automatic updates and background services need controlled timing so they do not interrupt a meal period.
Run the Kitchen Application on an Embedded Windows Platform

Bump Bar or External Input
The specification does not establish waterproofing for the complete installation, despite language in the legacy title. Enclosure protection and cleaning resistance require separate project confirmation. The completed system should clearly separate ordering, payment, printing and operational-control responsibilities.
Interface testing should include unavailable products, price changes, modifiers, cancelled tickets and an interrupted connection. These less attractive scenarios reveal more about daily reliability than a perfect demonstration order.
Plan for Heat, Cleaning and Service Access

Network Recovery
Mounting depth, cable direction, ventilation and removal access should be resolved in drawings. Staff also need a documented way to restart the application and identify whether a fault belongs to power, Windows, network, software or a peripheral.
Cleaning routines must suit the installed enclosure and input hardware. The base panel specification alone does not prove resistance to grease, water, chemicals or exposed outdoor conditions.
Test Peak-Hour Behavior before Volume Deployment

Shift Handover
A pilot should run through the busiest expected service cycle. Order completion time, corrections, printer delays and requests for assistance provide evidence for improving the interface before volume deployment.
For repeat purchases, the approved processor, RAM, storage, operating system, panel, interfaces and cosmetics should be recorded together. Configuration control prevents the Windows system ordering terminal from becoming a vague label applied to different hardware.
ZXTLCD works with distributors and system integrators on configuration and drawing review before production. Buyers can share software demand, installation constraints, quantity and peripheral plans so the proposed embedded station reflects the real restaurant project.
Long-term support is easier when each site retains the wiring plan, Windows image, application version and ownership contacts. This documentation helps the Windows system ordering terminal adapt to seasonal menus, store expansion and replacement needs without repeating the original engineering work.
Before the purchase order is released, stakeholders should approve the configuration list, front-opening drawing, connector access and software test result. Keeping these records together supports clearer factory communication and faster site diagnosis. It also gives multi-location operators a repeatable reference when a future counter is fabricated by a different local contractor.
Request Product Information
If you would like to get the specification about above product, or you hope to discuss your requirements or need any additional information on our this product , then please do not hesitate to send us a inquiry and contact our sales team now.




